top of page

VC-1 well before work-over operation (Bjelovar-Croatia)

VC-1 well after work-over while production test (Bjelovar-Croatia)

Wellhead equipment (Çanakkale-Turkey)

MTN Geothermal Power Plant (Çanakkale-Turkey)


Grinder, which was working with geothermal water
(Sındırgı-Balıkesir-Turkey)
Maren HB-8 production test (Aydın-Turkey)

Linde Gaz CO2 production (Aratol-Aksara-Turkey)

Dora-I geothermal power plant (Aydın-Turkey)

Blow-out in geothermal well (Aydın-Turkey)

Frozen inhibitor system while production test
(Manisa-Turkey)

Production Tests (Aydın-Turkey)

Broken 7 inc casing during drilling operation

IGA photography contest 2. prize
(Seferihisar-İzmir, Prof. Dr. Niyazi Aksoy)

Greenhouse, which is heating with geothermal water
(Aydın-Turkey)
bottom of page